Undertaking of Engineering Survey on the existing Water Points Project at Kamanga, Sengerema

About the Research

On July 2019, MERIT ENGINEERTING conducted the engineering survey on the existing DP’s at Kamanga village,

  • Project Title DP’s at Kamanga village
  • Client DP’s at Kamanga village
  • Category Survey
  • Location DP’s at Kamanga village,

Project Summery

On July 2019, MERIT ENGINEERTING conducted the engineering survey on the existing DP’s at Kamanga village, the study included assessing its performance, functionality, availability of water and operations, allocation of new strategic points, reporting, recommendation and documentation. The study covered the area of 5 – sub villages with a total of 5631 populations